10 min read

 In the following article by Austin Scott, the author of Learning RSLogix 5000 Programming, you will be introduced to the high performance, asynchronous nature of the Logix family of controllers and the requirement for the buffering I/O module data it drives. You will learn various techniques for the buffering I/O module values in RSLogix 5000 and Studio 5000 Logix Designer. You will also learn about the IEC Languages that do not require the input or output module buffering techniques to be applied to them. In order to understand the need for buffering, let’s start by exploring the evolution of the modern line of Rockwell Automation Controllers.

(For more resources related to this topic, see here.)

ControlLogix controllers

The ControlLogix controller was first launched in 1997 as a replacement for Allen Bradley’s previous large-scale control platform. The PLC-5. ControlLogix represented a significant technological step forward, which included a 32-bit ARM-6 RISC-core microprocessor and the ABrisc Boolean processor combined with a bus interface on the same silicon chip. At launch, the Series 5 ControlLogix controllers (also referred to as L5 and ControlLogix 5550, which has now been superseded by the L6 and L7 series controllers) were able to execute code three times faster than PLC-5. The following is an illustration of the original ControlLogix L5 Controller:


ControlLogix Logix L5 Controller

The L5 controller is considered to be a PAC (Programmable Automation Controller) rather than a traditional PLC (Programmable Logic Controller), due to its modern design, power, and capabilities beyond a traditional PLC (such as motion control, advanced networking, batching and sequential control). ControlLogix represented a significant technological step forward for Rockwell Automation, but this new technology also presented new challenges for automation professionals. ControlLogix was built using a modern asynchronous operating model rather than the more traditional synchronous model used by all the previous generations of controllers. The asynchronous operating model requires a different approach to real-time software development in RSLogix 5000 (now known in version 20 and higher as Studio 5000 Logix Designer).

Logix operating cycle

The entire Logix family of controllers (ControlLogix and CompactLogix) have diverged from the traditional synchronous PLC scan architecture in favor of a more efficient asynchronous operation. Like most modern computer systems, asynchronous operation allows the Logix controller to handle multiple Tasks at the same time by slicing the processing time between each task. The continuous update of information in an asynchronous processor creates some programming challenges, which we will explore in this article. The following diagram illustrates the difference between synchronous and asynchronous operation.


Synchronous versus Asynchronous Processor Operation

Addressing module I/O data

Individual channels on a module can be referenced in your Logix Designer / RSLogix 5000 programs using it’s address. An address gives the controller directions to where it can find a particular piece of information about a channel on one of your modules. The following diagram illustrates the components of an address in RsLogix 5000 or Studio 5000 Logix Designer:

The components of an I/O Module Address in Logix

Module I/O tags can be viewed using the Controller Tags window, as the following screen shot illustrates.

I/O Module Tags in Studio 5000 Logix Designer Controller Tags Window

Using the module I/O tags, input and output module data can be directly accessed anywhere within a logic routine. However, it is recommended that we buffer module I/O data before we evaluate it in Logic. Otherwise, due to the asynchronous tag value updates in our I/O modules, the state of our process values could change part way through logic execution, thus creating unpredictable results. In the next section, we will introduce the concept of module I/O data buffering.

Buffering module I/O data

In the olden days of PLC5s and SLC500s, before we had access to high-performance asynchronous controllers like the ControlLogix, SoftLogix and CompactLogix families, program execution was sequential (synchronous) and very predictable. In asynchronous controllers, there are many activities happening at the same time. Input and output values can change in the middle of a program scan and put the program in an unpredictable state. Imagine a program starting a pump in one line of code and closing a valve directly in front of that pump in the next line of code, because it detected a change in process conditions. In order to address this issue, we use a technique call buffering and, depending on the version of Logix you are developing on, there are a few different methods of achieving this. Buffering is a technique where the program code does not directly access the real input or output tags on the modules during the execution of a program. Instead, the input and output module tags are copied at the beginning of a programs scan to a set of base tags that will not change state during the program’s execution. Think of buffering as taking a snapshot of the process conditions and making decisions on those static values rather than live values that are fluctuating every millisecond.

Today, there is a rule in most automation companies that require programmers to write code that “Buffers I/O” data to base tags that will not change during a programs execution.

The two widely accepted methods of buffering are:

  • Buffering to base tags
  • Program parameter buffering (only available in the Logix version 24 and higher)

Do not underestimate the importance of buffering a program’s I/O. I worked on an expansion project for a process control system where the original programmers had failed to implement buffering. Once a month, the process would land in a strange state, which the program could not recover from. The operators had attributed these problem to “Gremlins” for years, until I identified and corrected the issue.

Buffering to base tags

Logic can be organized into manageable pieces and executed based on different intervals and conditions. The buffering to base tags practice takes advantage of Logix’s ability to organize code into routines. The default ladder logic routine that is created in every new Logix project is called MainRoutine. The recommended best practice for buffering tags in ladder logic is to create three routines:

  • One for reading input values and buffering them
  • One for executing logic
  • One for writing the output values from the buffered values

The following ladder logic excerpt is from MainRoutine of a program that implements Input and Output Buffering:

MainRoutine Ladder Logic Routine with Input and Output Buffering Subroutine Calls

The following ladder logic is taken from the BufferInputs routine and demonstrates the buffering of digital input module tag values to Local tags prior to executing our PumpControl routine:

Ladder Logic Routine with Input Module Buffering

After our input module values have been buffered to Local tags, we can execute our processlogic in our PumpControl routine without having to worry about our values changing in the middle of the routine’s execution. The following ladder logic code determines whether all the conditions are met to run a pump:

Pump Control Ladder Logic Routine

Finally, after all of our Process Logic has finished executing, we can write the resulting values to our digital output modules. The following ladder logic BufferOutputs, routine copies the resulting RunPump value to the digital output module tag.

Ladder Logic Routine with Output Module Buffering

We have now buffered our module inputs and module outputs in order to ensure they do not change in the middle of a program execution and potentially put our process into an undesired state.

Buffering Structured Text I/O module values

Just like ladder logic, Structured Text I/O module values should be buffered at the beginning of a routine or prior to executing a routine in order to prevent the values from changing mid-execution and putting the process into a state you could not have predicted.

Following is an example of the ladder logic buffering routines written in Structured Text (ST)and using the non-retentive assignment operator:

(*
I/O Buffering in Structured Text
Input Buffering
*)
StartPump [:=] Local:2:I.Data[0].0;
HighPressure [:=] Local:2:I.Data[0].1;
PumpStartManualOverride [:=] Local:2:I.Data[0].2;
(*
I/O Buffering in Structured Text
Output Buffering
*)
Local:3:O.Data[0].0 [:=] RunPump;

Function Block Diagram (FBD) and Sequential Function Chart (SFC) I/O module buffering

Within Rockwell Automation’s Logix platform, all of the supported IEC languages (ladder logic, structured text, function block, and sequential function chart) will compile down to the same controller bytecode language. The available functions and development interface in the various Logix programming languages are vastly different. Function Block Diagrams (FBD) and Sequential Function Charts (SFC) will always automatically buffer input values prior to executing Logic. Once a Function Block Diagram or a Sequential Function Chart has completed the execution of their logic, they will write all Output Module values at the same time. There is no need to perform Buffering on FBD or SFC routines, as it is automatically handled.

Buffering using program parameters

A program parameter is a powerful new feature in Logix that allows the association of dynamic values to tags and programs as parameters. The importance of program parameters is clear by the way they permeate the user interface in newer versions of Logix Designer (version 24 and higher). Program parameters are extremely powerful, but the key benefit to us for using them is that they are automatically buffered. This means that we could have effectively created the same result in one ladder logic rung rather than the eight we created in the previous exercise. There are four types of program parameters:

  • Input: This program parameter is automatically buffered and passed into a program on each scan cycle.
  • Output: This program parameter is automatically updated at the end of a program (as a result of executing that program) on each scan cycle. It is similar to the way we buffered our output module value in the previous exercise.
  • InOut: This program parameter is updated at the start of the program scan and the end of the program scan. It is also important to note that, unlike the input and output parameters; the InOut parameter is passed as a pointer in memory. A pointer shares a piece of memory with other processes rather than creating a copy of it, which means that it is possible for an InOut parameter to change its value in the middle of a program scan. This makes InOut program parameters unsuitable for buffering when used on their own.
  • Public: This program parameterbehaves like a normal controller tag and can be connected to input, output, and InOut parameters. it is similar to the InOut parameter, public parameters that are updated globally as their values are changed. This makes program parameters unsuitable for buffering, when used on their own. Primarily public program parameters are used for passing large data structures between programs on a controller.

In Logix Designer version 24 and higher, a program parameter can be associated with a local tag using the Parameters and Local Tags in the Control Organizer (formally called “Program Tags“). The module input channel can be associated with a base tag within your program scope using the Parameter Connections. Add the module input value as a parameter connection.

The previous screenshot demonstrates how we would associate the input module channel with our StartPump base tag using the Parameter Connection value.

Summary

In this article, we explored the asynchronous nature of the Logix family of controllers. We learned the importance of buffering input module and output module values for ladder logic routines and structured text routines. We also learned that, due to the way Function Block Diagrams (FBD/FB) and Sequential Function Chart (SFC) Routines execute, there is no need to buffer input module or output module tag values. Finally, we introduced the concept of buffering tags using program parameters in version 24 and high of Studio 5000 Logix Designer.